Site Preparation
Erecting fencing prior to the start of building works
Laying the slab
Pumping concrete for the slab
Fitout
Epoxy coating on the slab
Fitout
Plumbing in a basin
Nearing completion
Taking down the scaffolding
Fitout
Assembling cabinets for the kitchen area
Moving in
2017 BC (Before clutter)
Setting up
before the glass wall
Setting up
Metal lathe in position
Setting up
Drop saws and new work benches built by the members
New panel saw
funded by the Federal Dept of Health
November 2018
Keystone Constructions
Installation of Air Con Unit
Fixing the Compressor Unit